The message to which you are about to reply is shown first. GO TO REPLY FORM



 VIEW    REPLY TO THIS MESSAGE Replies to this message will be emailed.    PRINT   SAVE 

Re: Heater Core C70 1999

Sounds to me like your dealership is in the mood for raping your wallet. Hell no should it take 12 hours of labour to do. On average, it usually takes, real time, 3 hours from start to finish. So even if they are being pricks, at the most, they could bring that up to 4 hours, and probably, the real VCNA prescribed amount of time should be less then 3 if it takes them 3 on this particular job.






USERNAME
Use "claim to be" below if you don't want to log in.
PASSWORD
I don't have an account. Sign me up.
CLAIM TO BE
Use only if you don't want to login (post anonymously).
ENTER CAPTCHA CODE
This is required for posting anonymously.
OPTIONS notify by email
Available only to user accounts.
SUBJECT
MODEL/YEAR
MESSAGE

DICTIONARY
LABEL(S) +
IMAGE URL *
[IMAGE LIBRARY (UPLOAD/SELECT)]

* = Field is optional.

+ = Enter space delimited labels for this post. An example entry: 240 muffler


©Jarrod Stenberg 1997-2022. All material except where indicated.


All participants agree to these terms.

Brickboard.com is not affiliated with nor sponsored by AB Volvo, Volvo Car Corporation, Volvo Cars of North America, Inc. or Ford Motor Company. Brickboard.com is a Volvo owner/enthusiast site, similar to a club, and does not intend to pose as an official Volvo site. The official Volvo site can be found here.