The message to which you are about to reply is shown first. GO TO REPLY FORM



 VIEW    REPLY TO THIS MESSAGE    PRINT   SAVE 

Ron Kwas 120-130 1966

Well hate do this but I am left with no other option.

I placed an order with Ron on 1/14/10 for an alternator upgrade kit and a ignition switch upgrade kit. On 1/16/10 he sent:

"We have received your order and PayPal transfer, thank you. I'll give you a heads-up message when your kits go out."

I have since sent multiple emails in regards to the status of my parts. I am stuck waiting for these parts before I can go further on my 122s project. I have the infamous gorilla return spring and 3 fatigued keys. I fear snapping them off in the ignition cylinder and have had to avoid driving my 122s.

It has now been over 2 weeks and still no parts or response to speak of. I know that Ron has internet service because his brickboard status showed that he visited brickboard yesterday.



Ron where are my parts?






USERNAME
Use "claim to be" below if you don't want to log in.
PASSWORD
I don't have an account. Sign me up.
CLAIM TO BE
Use only if you don't want to login (post anonymously).
ENTER CAPTCHA CODE
This is required for posting anonymously.
OPTIONS notify by email
Available only to user accounts.
SUBJECT
MODEL/YEAR
MESSAGE

DICTIONARY
LABEL(S) +
IMAGE URL *
[IMAGE LIBRARY (UPLOAD/SELECT)]

* = Field is optional.

+ = Enter space delimited labels for this post. An example entry: 240 muffler


©Jarrod Stenberg 1997-2022. All material except where indicated.


All participants agree to these terms.

Brickboard.com is not affiliated with nor sponsored by AB Volvo, Volvo Car Corporation, Volvo Cars of North America, Inc. or Ford Motor Company. Brickboard.com is a Volvo owner/enthusiast site, similar to a club, and does not intend to pose as an official Volvo site. The official Volvo site can be found here.